S.NO |
ACTIVITY PLANNED |
1 |
Lake Geography, natural flora and fauna. |
2 |
Types of surface flow into the lake. |
3 |
Historical information on the lake |
4 |
Varying depths or water levels of the lake. |
5 |
The water / waste water analysis of the lake. |
6 |
Outlet point of the lake too, and at least a sluice gate should be in place. |
7 |
Streams of Storm water and sewage drains / nullah / major ditches come and mix or drain into the lake. |
8 |
Water samples - BOD/COD/SS/TDS/oil and Grease, Chloride, etc- Major Stream which comes into Lake. |
9 |
Near by areas of the streams-Decentralised Treatment plant. |
10 |
Finalising the zone of influence |
11 |
Order of importance based on the most polluted Zone |
12 |
Zone of influence A1. A1, A2, A3- Treatment plant Input/ output location too. |
13 |
Decide the working Procedure |
14 |
Plan the needed Physical, Mechanical and Automobile support systems. |
15 |
Locate the premise for Composting the Water borne flora. |
16 |
Selection of composting technology. |
17 |
Quantity of Microbial Powder / liquid needed to conduct the Composting and support staff. |
18 |
Hazards, Saftey and Precautions taken / to be taken. |
19 |
Preparation of Costing and activity plans. |
20 |
Calculation of required Oxygen – Number of Aerators. |
21 |
Aeration mode, type of Aerators and Time of Aeration. |
22 |
Method of placing, tying and provisions for the same – electrification, Automatic timer and cabling. |
| |